MCQ
Q.
A system with 5 processes P0 through P4 and three resource types A, B, C have A with 10 instances, B with 5 instances, and C with 7 instances. At time t0, the following snapshot has been taken: leads the system to ____________
Process
P0
P1
P2
P3
P4
Allocation (process-wise : P0 through P4 top TO bottom)
A B C
0 1 0
2 0 0
3 0 2
2 1 1
0 0 2
MAX (process-wise: P0 through P4 top TO bottom)
A B C
7 5 3
3 2 2
9 0 2
2 2 2
4 3 3
Available
A B C
3 3 2The sequence
Correct Answer: B
None.